Client : Zwart Techniek BV
Subject : Replacement 2 pieces of CHP plants
Given the replacement of the existing CHP installation of the De Knip office building in Amsterdam, BAM Techniek awarded the contract for this to Zwart Techniek bv in IJmuiden.
By order of this company we dismantled the existing installation and by means of the installation of a 650 tons crane equipped with 72 meters of luffing jib we carried out the vertical transport from the technical room through the architectural roof opening to the first floor and subsequently hoisting and placing 1 new NSA installation.
With regard to the closure of the existing road network, there was extensive consultation with the relevant district council for this purpose and the work was carried out over a weekend (see lifting plan).