Industrial relocation

What is an industrial relocation?

For industrial relocations, we move machinery, production lines, and equipment. This can be done internally, within your own factory building, or externally, to a new location in the Netherlands or abroad. The scope ranges from a single machine or a workshop to an entire factory, including machinery and a warehouse.

If you're looking for individual machines, read more about move machines. If your entire company is relocating, please see business relocation.

Get in touch with us!

Industrial relocation

Nedmove specializes in carrying out industrial relocations and (re)placements both nationally and internationally in industries such as :

In addition to the industries listed above, we also handle industrial relocations for countless other industries—please contact us to discuss all the options! 

What types of machinery and equipment do we move?

Every industry has its own requirements. In chemical plants, additional safety precautions apply to personnel and machinery. Sensitive equipment requires the proper lifting points, special packaging, or a climate-controlled trailer. We serve clients in sectors such as data centers, installation engineering, the food and dairy industries, and energy and cogeneration plants.

75+ Projects implemented
In 15 Countries
25+ Years of Experience

Industrial relocation from A to Z

Industrial relocations are very large undertakings involving many different activities, at Nedmove we plan and execute complete industrial relocations from disassembly at the old location to maintenance after installation at the new location.

This means you don't have to hire all sorts of different companies for different phases of the move, everything is planned and executed according to your timeline.

industrial relocation

Preparation: assessment, engineering, and permits

Every move begins with an inventory and technical preparation. This allows us to know exactly what equipment and personnel are needed, and to identify risks before they become a hazard. For large projects, this often takes place months in advance.

We also handle the engineering, route planning, and permits and exemptions. We check the route for sharp turns, low overpasses, and other obstacles, and, where necessary, we coordinate the transport with the municipalities along the route.

industrial relocation - factory relocation

Relocation Phases / Services

Every industrial relocation has a number of phases/services:

Some industrial moves require lifting operations to move the machinery, this is a service we also provide. Click HERE To read more about our lifting operations.

project removals - project relocation

What are you looking for when it comes to your industrial relocations?

When moving valuable machinery and equipment, you want to be able to rely on a party that understands what's at stake. With years of experience in complex industrial moves, we know exactly how to move your machinery and equipment safely, efficiently and without unnecessary downtime.

Companies in the food and dairy, chemical and process industries, data centers, plant engineering and manufacturing and machinery factories choose us because of our meticulous approach, clear communication and focus on continuity. From planning to reinstallation, we think in solutions and take care of your entire industrial relocation with an eye on safety, time and results.

View some of our projects to the right →

Business relocation
De-Montage

Black - the Knip amsterdam

Given the replacement of the existing CHP installation of the office building De Knip in Amsterdam, BAM Techniek awarded the contract for this to Zwart ...
Read more
moving machines 2
Industrial relocation

Remia move from Dijk food

With the acquisition of van Dijk Food in Lopik by Remia CV, it was decided to move the entire production to the Den ...
Read more

Collaboration

Our projects are mostly realized based on a turnkey project approach in which all additional disciplines both mechanical and electrical are performed in-house.

Nedmove also works with strategic partners on some projects to ensure that every industrial relocation we perform is equipped with the exact supplies needed to make the project run as smoothly as possible and with the least amount of delay.

industrial relocation 2

The phases of industrial relocations

1. Disassembly

An industrial move starts with the dismantling of all equipment and machinery, these must be carefully and with precision disassembled and loaded to ensure that no damage is done before or during transportation.

2. Transport

At Nedmove, we have experience transporting machinery and equipment of all different shapes and sizes. Both nationally and internationally. So you don't have to worry about your equipment. Transporting heavy and sensitive machinery requires expertise and for that you have come to the right place at Nedmove.

Inside the building, we move machinery using transport rollers, forklifts, moving and lifting gantries, skids, and hydraulic jacks. This prevents damage to the machinery, your floor, and the surrounding area—even in tight factory spaces where a standard crane cannot fit. For road transport, we use flatbed trailers, modular trailers, and special-purpose transport vehicles. We package sensitive machinery and loose parts to protect them from impacts and moisture.

3. Storage

It is common for companies to have to move machinery and equipment before the new location is ready for this, in these cases storage needs to be arranged that meets the requirements of the machinery. Nedmove offers storage facilities suitable for a variety of sizes and types of equipment.

In addition to machinery, we also store equipment, containers, and units, both climate-controlled and non-climate-controlled.

4. Assembly

After the move, the machines and equipment must be reinstalled carefully and precisely so that everything can be put back into use immediately. Nedmove ensures correct placement, alignment and connection according to technical specifications of your machines and equipment.

After installation, we carefully align each machine, recalibrate it, and test it thoroughly. The move is not considered complete until everything is working at least as well as it did at the old location.

5. Maintenance after installation

It is important that machines and equipment are operational immediately after relocation and remain in top condition so that your production process can continue smoothly and trouble-free. To ensure this, we also provide industrial maintenance after relocation.

Reduce production downtime

Fountain by the canal

How long does an industrial move take?

That depends on the scope and complexity of the project. During the planning phase, we review each step and establish a realistic timeline. This allows us to keep the turnaround time as short as possible without compromising safety or quality.

Safety

All of our employees are VCA-certified. We use lifting and transport equipment appropriate for the weight and the situation, and follow established protocols. This is how we protect your staff, our people, your machinery, and the quality of your products.

International industrial relocations

We transport machinery to and from other countries, both within and outside Europe. For each country, we plan the route and arrange for special permits and transport escorts. Within the EU, we take into account the traffic regulations of each country. Outside the EU, we also handle export and import declarations, specifying the brand, type, serial number, year of manufacture, and value for each item. You can read more about this at machine transport.

RPC BEBO – Morgantown (USA) International Move 7

Budget discussion

In any industrial relocation, budget and time play an important role. Therefore, in consultation with the client, the project office will prepare the required work plan within the set criteria of budget and schedule.

During the budget discussion, mapping is done:

Based on this inventory, an itemized proposal is made. In this we take into account:

We believe in open communication about budgets and schedules. Throughout the project, the project office stays in close contact with the client. Any changes, additional work or delays are always discussed in a timely manner, so there are never any surprises.

Projects performed by Nedmove

Scroll to Top