Client : HITEC Power Protection bv
Subject : Installation of 6 No Break installations RABO Datacenter Boxtel
Given the expansion and replacement of the existing emergency power supply, Hitec Power Protection received the order to supply 6 units of No Break installations.
Of these, 4 were installed through a structural opening in the facade side in the 1st floor technical room and 2 on the first floor.
With regard to the maximum allowable floor load, use was made of this by means of an air cushion transport system.