...

HITEC - RABO Boxtel

Client : HITEC Power Protection bv

Subject          : Installation of 6 No Break installations RABO Datacenter Boxtel

 

Given the expansion and replacement of the existing emergency power supply, Hitec Power Protection received the order to supply 6 units of No Break installations.

Of these, 4 were installed through a structural opening in the facade side in the 1st floor technical room and 2 on the first floor.

With regard to the maximum allowable floor load, use was made of this by means of an air cushion transport system.

en_USEnglish
Scroll to Top
#!trpst#trp-gettext data-trpgettextoriginal=947#!trpen#Seraphinite Accelerator#!trpst#/trp-gettext#!trpen##!trpst#trp-gettext data-trpgettextoriginal=948#!trpen#Optimized by #!trpst#trp-gettext data-trpgettextoriginal=947#!trpen#Seraphinite Accelerator#!trpst#/trp-gettext#!trpen##!trpst#/trp-gettext#!trpen#
#!trpst#trp-gettext data-trpgettextoriginal=949#!trpen#Turns on site high speed to be attractive for people and search engines.#!trpst#/trp-gettext#!trpen#