Industrial relocations in practice - safety, planning and continuity

Industrial relocations (moving heavy machinery, production lines or even entire factories) require careful planning, strict safety measures and a thoughtful approach to ensure production continuity.

Mistakes can lead to downtime and every minute of downtime costs money, which is why at Nedmove we always ensure tight planning, risk inventory, process documentation, proper permits and proper safety precautions for personnel and the machinery they work with.

We provide turn-key solutions for relocations from a single machine to complete plant installations. Please contact us to discuss your options.

Get in touch with us!

75+ Projects implemented
In 15 Countries
25+ Years of Experience

Quality and safety in lifting and moving heavy objects

Lifting and moving heavy objects involves risks. Strict safety regulations apply to these moves. Manufacturing companies are required by law to follow rules to ensure the safety of personnel.

In order to prevent accidents, we always use the right equipment that is tailored to the situation and the weight of the heavy objects to be lifted and moved. This not only prevents damage to machinery, infrastructure and floors, but also makes it as efficient and controlled as possible, even in tight or complex spaces.

We take extensive measures to ensure the safety of personnel, machinery and the quality of execution. All employees involved are VCA certified and have undergone the necessary training.

By making preparations, using protective equipment and following protocols, we minimize risks and ensure the safety of people and valuable machinery.

Quality and safety in lifting and moving heavy objects

Keeping production running during a move

The biggest problem with companies looking to move production plant is production downtime, but fortunately there is a solution that works for many companies and that is to phase the move.

By doing the move in stages, one part of plant can continue to produce while the other part is moved, once the part being moved is installed at the new location and can produce again, the second part of the plant can be moved.

Despite temporarily not producing at full capacity, you can continue to produce.

Companies with production processes that are done in stages can also use pre-production to avoid production downtime. Preproduction allows it to be finished in the second part of the production process while the first part is being moved.

Lead time of an industrial relocation project

Lead times for industrial relocation projects vary greatly, this depends on the size and complexity of a project. The timeline of the relocation project is determined during the planning phase, during planning all factors within each phase of the move are considered, allowing realistic timelines to be set.

This is often done months before the actual move so that all supplies can be arranged early and no unnecessary delays are incurred.

We strive to keep the lead time of the move as short as possible without compromising safety and quality. Besides safety, it is of course of utmost importance that the machines function as well or even better at the new location.

If you are looking for a party that can perform the move as efficiently as possible, please get in touch to discuss your options.

Planning a plant transfer or machine park move

Moving a factory or an entire fleet of machinery requires extensive and detailed planning and preparation. Every successful move is product of proper planning.

In the planning phase, everything is mapped out, exactly which plants, machines and equipment need to be moved, when should each step be done, what personnel are needed, what tools are needed and, most importantly, a risk inventory is done to ensure the safety of personnel and machines.

With extensive planning and preparation, we can make the move efficient and smooth to minimize turnaround time and get you back to production quickly. If you are curious about the possibilities, please contact us!

Moving during production hours

Moving machinery and equipment during production hours is complex and requires additional measures. Personnel performing the move must physically separate the work from ongoing production.

This means setting up safe work areas, this consists of cordons, markings and possible fencing to ensure that personnel from both sides do not accidentally enter the wrong area.

Communication and coordination are crucial in a move during production hours; there must be precise coordination between move personnel and production management as to when lifting and transport operations can take place.

When moving during production hours, flexibility is essential; if something changes in the production schedule at the last minute, it must be possible to adjust for this and adjust the moving schedule immediately.

Need to move machinery during production hours? Contact us to discuss the possibilities.

Disassembly 4

The benefits of outsourcing to industrial moving specialists

Outsourcing a moving project brings many advantages and especially since we can take care of this turn-key for you. These advantages are in the areas of speed, safety and security. Here are a few advantages:

In short, outsourcing results in a faster, safer and more efficient move. The investment in specialists easily pays for itself in time savings, shorter downtime, damage prevention and peace of mind.

Would you like to outsource your move? Contact us to discuss your options.

International industrial relocations

International industrial relocations bring additional challenges in terms of logistics, legislation and coordination. International relocations require thorough route planning and waivers and permits must be applied for.

The rules vary from country to country, so this requires the specialized knowledge Nedmove has in-house. Nedmove has experience with countless international moves within and outside Europe.

We plan out the most suitable route and arrange the waivers and transport escorts needed for each country on the route in a timely manner. In doing so, we consider the dimensions and weight of each object to be transported and determine the means of transportation to be used and the obstacles on the route.

In addition to logistical planning, customs formalities also come into play, especially when moving outside the EU. Within the European Union, moving across borders is relatively easy. Of course, the different traffic regulations that apply in the countries through which the route passes must be taken into account.

Outside the European Union it becomes more complex, this requires full customs clearance. This means that before departure export declarations have to be made in the Netherlands and import declarations have to be made in the destination country. All objects/goods crossing the border must be accurately described, stating brand, type, serial number, year of manufacture and value.

This requires extensive preparation. Nedmove can take this off your hands completely. Are you curious about the possibilities? Then get in touch to discuss them.

The complete solution

Whether it is a national or international move, successful industrial relocations have a few things in common and that is thorough preparation, safety and craftsmanship.

For moves within the Netherlands and moves across the border, you can rely on Nedmove for a complete turn-key solution. Feel free to contact us to discuss the possibilities.

The complete solution for industrial removals

Machine removals performed by Nedmove