Moving machinery - Nedmove BV

Moving machinery

Nedmove BV

You can let Nedmove BV take care of the entire process of moving your machines, from disconnecting and dismantling at the old location to assembly and coupling at the new location.

From A to Z, completely unburdened and according to the agreed timeline so that you can continue production as soon as possible and there are minimal interruptions to your business activities.

With professional staff, the necessary special tools and years of experience, we can perform this entire process smoothly and carefully for you. Every machine move is unique, please contact us to discuss the possibilities.

Get in touch with us!

75+ Projects implemented
In 15 Countries
25+ Years of Experience

Sectors and diversity of machinery

Machine removals occur in many different industries. In industry, they often involve heavy production equipment such as: press machines, CNC machine tools, production lines or complete factory components.

In the medical sector, this may involve highly sensitive and valuable machinery such as: MRI and CT scanners, X-ray equipment or complete laboratory setups.

In offices and commercial environments, specialized relocation may also be required for such things as: large servers/data center equipment, printing and printing machines or heavy safes.

moving machines 5
Moving machinery - Nedmove BV

Every sector and machine brings its own requirements and concerns, from the hygiene requirements of a hospital to the size and weight of industrial machines. For this reason, we tailor our approach precisely to the requirements of the specific sector and type of equipment.

Contact us for a customized solution for moving your machinery.

What is the process of moving machines

A machine move consists of a number of different parts. The first step is the inventory and planning, once this is complete, it is time for the disconnection, dismantling, moving and, of course, assembly and reconnection. Below is a further explanation of each step in the machine moving process.

Inventory and planning

We start with thorough preparation, this consists of an inventory of the machines, the current location of the machines, the route to the new location and the new location. This thorough preparation and inventory allows us to plan very accurately so that everything runs smoothly and there are no unexpected or unnecessary obstacles.

arrow right disassembly step 2 and 4
arrow left disassembly step 3 and 5 move machines

Decoupling and Disassembly

Before the machines can be disassembled, the staff takes care of disconnecting the machines, this consists of disconnecting power, gas, water or compressed air lines and draining fluids such as oil and coolant. Once this is complete, it is time for disassembly, during disassembly each part is neatly labeled and documented so nothing is lost and after this it is safely packed (if necessary) for relocation.

Uithuizen and loading

After disassembly, it is time to move the machinery out of its current location and load it onto the vehicles making the transport. Moving out is often done with cranes, forklifts, hydraulic jacks and other tools. On occasion it may be necessary to make structural adjustments to the building such as temporarily removing a wall or roof panel so that the machines can be lifted out of the building, this is of course done by mutual agreement.

arrow right disassembly step 2 and 4
arrow left disassembly step 3 and 5 move machines

Machine move to new location

Now the machines are loaded onto the vehicles and it is time to transport. Special transportation is often required when moving machinery, this is when the size or weight of the machinery is too large to be transported by normal trucks. This process involves thorough preparation and may involve escorts for possible road closures if needed.

Unloading, moving in and positioning

Once the machines have arrived at the new location, it is time to unload, move them in and position them in their assigned positions in the new building. Moving the machines in may again require temporary removal of walls or roof panels to make room. Once the machines are in the building, it is time for assembly and reconnection at the appropriate locations in the new building.

arrow right disassembly step 2 and 4

installation and reconnection

The machines are carefully reassembled and serviced so that they can resume the production process at the new location as soon as possible and within the timeline. Assembly is carefully performed and all assembly requirements of the specific machines are taken into account. After assembly and reconnection, everything is tested for operability and the machine relocation is complete.

moving machines 2
Moving machinery - Nedmove BV

Technical requirements machine moving company

There are unique technical requirements for every machine move, this involves special equipment, tools, skilled personnel and protection because safety is the priority in every machine move.

The technical requirements are carefully inventoried for each machine move and incorporated into the plan.

What can we do for you

We offer a total solution for your machine relocation. The entire process is unburdened for you and carried out with professionalism and care for a smooth process with minimal downtime in your operations.

Every machine move is unique, which is why we work with a plan of action specifically tailored to each unique situation. Please contact us to discuss the possibilities of moving your machinery.