Project relocation

Industrial-size project relocation

Het verplaatsen van zware machines, complexe productielijnen, gevoelige laboratoriumapparatuur en meer, wordt niet meer gezien als een simpele logistieke operatie, maar als een engineeringoperatie waar allerlei verschillende disciplines bij komen kijken.

It is not only the transportation of the machines, but also the proper disconnection and disassembly at the old location, the alignment and assembly at the new location, and the rigorous advance planning phase that makes it a complex undertaking.

This must all be done safely - for personnel and equipment - and comply with all laws. We can take this entire process off your hands so you no longer have to worry about it. Please contact us to discuss all options.

Get in touch with us!

75+ Projects implemented
In 15 Countries
25+ Years of Experience

The most important phase of any project move

To ensure that everything runs smoothly and safely, every project move requires a detailed risk assessment and planning. This minimizes risks throughout the moving process, ensures minimal downtime and allows us to stick to deadlines as tightly as possible.

By performing everything safely and efficiently, we save a lot of costs from damage to machinery, longer-than-expected downtime in production and more.

Project relocation planning and risk assessment

How do we proceed? The technical execution

We tackle everything from start to finish. Turn-key. This ensures that you don't have to make a composite of four companies for your project move, but can put everything down to one party who will take care of everything for you.

We perform the following parts of the project relocation: risk assessment → planning → decoupling and dismantling → moving outside → transportation → moving inside → aligning and placing everything → assembly and coupling → testing and aftercare.

We kunnen ook ondersteunen in lifting operations en eventuele bouwkundige aanpassingen om machines naar buiten te verhuizen.

Ook het regelwerk nemen wij van u over. Wij vragen de benodigde vergunningen en ontheffingen aan, bijvoorbeeld voor exceptioneel transport of een tijdelijke wegafzetting. Waar nodig zorgen wij voor conditioned storage, zodat machines die even niet geplaatst kunnen worden goed beschermd blijven.

Bent u op zoek naar een partij die dit voor u uit handen kan nemen? Neem gerust contact op om de mogelijkheden te bespreken.

The challenge of limited space

Project relocations are often done in parts, resulting in machinery and equipment having to be disassembled and assembled in an active production environment where space is limited.

Limited space with margins of only a few centimeters are no exception when maneuvering machines within active production environments. This requires not only extreme caution on the part of mechanics, but also the use of equipment and specialized techniques that occupy less space than traditional cranes.

Among other things, we specialize in dismantling and moving machines outside within limited space. Do you have a machine that is cramped but needs to be moved to another location? Contact us for your options.

Moving heavy machinery internally

In addition to dismantling the machines and plants, they also need to be moved outside or sometimes just moved internally. In these cases, we often use air cushion systems.

With jacks we lift the machines a few inches so we can install the air cushion system under the machine, once the air cushion system is installed we can easily move the machine.

Voor verticaal transport en het overbruggen van hoogteverschillen worden vaak hydraulische vijzelsystemen ingezet. Een vijzel tilt de zware machine op met behulp van hydraulische kracht, waarna deze op een slee kan worden geplaatst om horizontaal verschoven te worden zonder de noodzaak van wielen.

internal relocation of heavy machinery in a project move

Downtime minimization

It is important for all companies to keep downtime to a minimum. The faster production can continue, the better. There are several strategies for project relocations to keep downtime to a minimum.

Phased relocation

One of the most widely used and effective strategies is a phased relocation. Instead of moving everything at once and requiring the new location to be fully ready immediately, we provide a temporary interim location for machine parts. This allows for a metered distribution to the new location so the installation teams can work more efficiently.

Turn-key projects

Turn-key projects are also highly recommended. This means we take care of everything for you, from planning to aftercare. This way, you do not have to work with four companies at the same time and coordination does not become a disaster. This ensures greater efficiency and thus minimal downtime for your operation.

Veiligheid tijdens projectverhuizingen

Safety is always the priority. Safety of personnel and machinery is of utmost importance, for this reason it is the first thing we take care of. A rigorous risk assessment at the beginning of the project move allows us to identify all potential hazards. This allows us to prepare for them and eliminate the risks before they become a problem.

Daarbij heeft ons personeel alle benodigde certificeringen en de ervaring van voorgaande projecten wat ze een uniek inzicht geeft in het proces en hoe deze uitermate veilig uitgevoerd kan worden. Geen ongelukken is essentieel en geen schade aan machines bespaart veel onnodige kosten.

Safety during a project move

The economic impact of alignment

The benefits of professional alignment are directly measurable in operations. A correctly aligned machine uses less energy and has significantly lower maintenance costs due to reduced wear of bearings, seals and couplings.

In addition, machine tool life is increased and production quality increases due to less vibration. Arriving at the new location, we align each machine so you can take advantage of all the above benefits.

Machine alignment after a project move

Nedmove BV

Wij voeren al 25+ jaar projectverhuizingen uit in 15 landen, zowel binnenlands als naar andere landen, binnen en buiten de Europese Unie. Voor elke projectverhuizing ontvangt u vooraf een heldere kostenraming. Zo weet u waar u aan toe bent. Bent u op zoek naar een turnkey oplossing voor uw projectverhuizing, dan kunnen wij deze aan u geven. 

Please feel free to contact us to discuss all your project relocation options.

Nedmove BV truck

Machine removals performed by Nedmove