Client : PURAC Gorinchem
Subject : Dismantling and placing insulators in storage
With regard to the relocation of part of a production process, Purac commissioned the dismantling of the existing piping and disconnection of the 4 insulators, internal horizontal transport to under the existing lifting opening, vertical transport by means of a 400-ton crane and placing at a temporary storage location for the purpose of moving to a new location.