PURAC - DISASSEMBLY INSULATORS

Client : PURAC Gorinchem

Subject          : Dismantling and placing insulators in storage

 

With regard to the relocation of part of a production process, Purac commissioned the dismantling of the existing piping and disconnection of the 4 insulators, internal horizontal transport to under the existing lifting opening, vertical transport by means of a 400-ton crane and placing at a temporary storage location for the purpose of moving to a new location.

en_USEnglish
Scroll to Top
#!trpst#trp-gettext data-trpgettextoriginal=947#!trpen#Seraphinite Accelerator#!trpst#/trp-gettext#!trpen##!trpst#trp-gettext data-trpgettextoriginal=948#!trpen#Optimized by #!trpst#trp-gettext data-trpgettextoriginal=947#!trpen#Seraphinite Accelerator#!trpst#/trp-gettext#!trpen##!trpst#/trp-gettext#!trpen#