Client : Purac Netherlands
Subject : Relocation of VDU Plant from Gorinchem to Blair (USA)
Nedmove has received the order from PURAC for the purpose of moving a complete VDU (Vacuum Distiller Unit) plant from Gorinchem to Blair (USA).
Given that this plant is part of a plant whose production was not to be interrupted, the dismantling work was carried out with the utmost care.
The work consists of dismantling the installation including marking all fittings and piping for reassembly, loading the installation parts in containers and on skids, overseas transport via the port of Antwerp to Houston, loading on transport combinations, transport to Blair and unloading on site for assembly at a later stage.