Client : Naftobudowa SA
Subject : Moving several storage tanks
Given the expansion of current storage capacity, it was decided to move some tanks locally to a new location on the site.
At the time, the tanks in question were assembled on site in parts, so there were no lifting points available to move them completely. Temporary lifting beams were calculated and designed by our engineering department.
Given the dimensions(height 18 mtr, diameter 12 mtr) and weight (65 tons) of the tanks in question, the relocation was carried out using 1 x 650 ton crane and 10 line platform trailers.
To reach the new location, a 100-meter plate track was laid out for this purpose and given that the position of the crane between the foundations of the new locations was necessary, steel partitions were used which were placed in the heart of the drilling piles.